Certikin is the perfect fit

The engine room of this striking pool and fitness suite, designed and built by Warwickshire-based Buckingham Pools for a luxury retirement development in Romsey, Hampshire, proudly boasts the Certikin name.

The health and wellness complex is built with versatility and functionality in mind to provide the residents with a relaxing facility in which to unwind. In constant use, the pool features a Fluvo Rondo counter-current unit supplied by Certikin.  The unit comes with separate rotary buttons to provide the desired setting for air and water adjustment.

Certikin also supplied the complete filtration system – two SLX filters and three Hydrostar circulation pumps providing a turnover of less than three hours to optimise the usability. Alongside the pumps, Certikin has also supplied three inverters to make them variable speed. Easy to install and programme, these inverters offer a potential cost saving payback of less than six months.

The pool, measuring 12m x 6m, is meticulously finished with large-format, marble effect tiles. With the perfectly edged built-in step-entry, the interior finish completes an elegant look with the stylish surrounding décor and marble feature walls to contrast with the exposed walnut wood-effect floor tiles. The underwater lighting installations enhance the relaxing ambience to offer daylong activity, whether swimming or lounging.

t. 01926 852351 | w. buckinghampools.com

A pool fit for King’s

Sitting on an 80-acre campus in the Cheshire heartland of Macclesfield, King’s School is renowned nationally for its excellence in sport.  When the governors of King’s made the decision to upgrade their sports facilities with a new 25m x 13m (1-2m depth) swimming pool for training, competitions and galas, Warwickshire-based Buckingham Pools quickly rose to the surface as its builder of choice. In turn, Buckingham chose its tried and trusted supplier, Certikin International, to provide much of the pool’s equipment.

Taking some eight months to design and build, the six-lane indoor pool is the jewel in the crown for a school that has in recent years produced pupils that have represented their country or been national champions in 22 different sports.

Certikin supplied the complete filtration system – two SLX filters and three circulation pumps providing a turnover of less than three hours to optimise the usability. Alongside the pumps, Certikin provided three inverters to make them variable speed. Easy to install and programme, these inverters offer a potential cost saving payback of less than six months.

Finishing off the swimming pool are Certikin’s gleaming stainless steel Gibraltar Rails ladders which come with anti-slip treads as standard.

Buckingham Pools offered a comprehensive QA package alongside its robust Design & Build methodology to ensure longevity and long-term assurance. Taking full responsibility for building the shell with shotcrete methodology resulted in exacting tolerances required over and above traditional concrete construction methods to ensure the pool complies with all the necessary standards.

t. 01926 852351 | w. buckinghampools.com